Academic Journal
Earned value management used to monitor the project costs of ballast system fabrication and installation on a cargo ship
العنوان: | Earned value management used to monitor the project costs of ballast system fabrication and installation on a cargo ship |
---|---|
المؤلفون: | Dragoș Damianov, Carmen Gasparotti |
المصدر: | Annals of "Dunărea de Jos" University of Galaţi: Fascicle XI Shipbuilding, Vol 47, Pp 25-32 (2024) |
بيانات النشر: | Galati University Press, 2024. |
سنة النشر: | 2024 |
المجموعة: | LCC:Ocean engineering LCC:Naval architecture. Shipbuilding. Marine engineering |
مصطلحات موضوعية: | earned value management, project performance, acwp, bcwp, bcws., Ocean engineering, TC1501-1800, Naval architecture. Shipbuilding. Marine engineering, VM1-989 |
الوصف: | The development of projects in the naval field is of crucial importance for the industry. Their success depends on how their costs and duration are managed. The study aims to present how naval projects can be monitored using Earned Value Management (EVM), a technique used to evaluate their performance from the point of view of costs. The Earned Value analysis has been applied to the manufacture and installation of a ballast system on a cargo ship. The results obtained have demonstrated that savings are achieved, and the works are delayed compared to the plan. |
نوع الوثيقة: | article |
وصف الملف: | electronic resource |
اللغة: | English |
تدمد: | 1221-4620 2668-3156 |
Relation: | https://www.gup.ugal.ro/ugaljournals/index.php/fanship/article/view/7050; https://doaj.org/toc/1221-4620; https://doaj.org/toc/2668-3156 |
DOI: | 10.35219/AnnUgalShipBuilding/2024.47.03 |
URL الوصول: | https://doaj.org/article/d7e8f6962a4041bb80f181aa22d67919 |
رقم الانضمام: | edsdoj.7e8f6962a4041bb80f181aa22d67919 |
قاعدة البيانات: | Directory of Open Access Journals |
تدمد: | 12214620 26683156 |
---|---|
DOI: | 10.35219/AnnUgalShipBuilding/2024.47.03 |