Academic Journal
Deformation Control for Foundation Pit Segmented Construction Adjacent to Operational High-speed Railway Lines
العنوان: | Deformation Control for Foundation Pit Segmented Construction Adjacent to Operational High-speed Railway Lines |
---|---|
المؤلفون: | LI Xiaolong, LIAO Weilian, XIAO Fei, CHEN He, DI Honggui, HE Shuqi |
المصدر: | Chengshi guidao jiaotong yanjiu, Vol 27, Iss 8, Pp 223-226 (2024) |
بيانات النشر: | Urban Mass Transit Magazine Press, 2024. |
سنة النشر: | 2024 |
المجموعة: | LCC:Transportation engineering |
مصطلحات موضوعية: | foundation pit, segmented construction, deformation control, operational high-speed railway line, Transportation engineering, TA1001-1280 |
الوصف: | Objective Limited land use resource and arrangement adjacent to operational high-speed railway lines pose significant challenges to some city foundation pit constructions and the railway operational safety. To reasonably predict and control the foundation pit and adjacent high-speed railway subgrade deformations, it is necessary to conduct deformation control studies on foundation pit construction. Method Based on an open-cut foundation pit near a high-speed railway subgrade in Shanghai, Plaxis 3D software is used to analyze the impact of different foundation pit segmented construction lengths on the enclosure structure and adjacent high-speed railway subgrade, and the deformation control effectiveness of segmented construction on foundation pit itself and adjacent high-speed railway subgrade is analyzed according to field-measured data. Result & Conclusion Segmented construction can effectively reduce the deformation of both the foundation pit enclosure structure and the existing high-speed railway subgrade. The shorter the segmented length is, the smaller the deformation of foundation pit and existing high-speed railway subgrade, and the more evident inhibition corner effect formed by foundation pit segmentation walls has on enclosure structure deformation. Based on field measurement data, with a segmented length of 30 m, both of the foundation pit enclosure structure deformation and the high-speed railway subgrade vertical deformation remain in standard limits; however, the subgrade horizontal deformation exceeds the limit requirements. |
نوع الوثيقة: | article |
وصف الملف: | electronic resource |
اللغة: | Chinese |
تدمد: | 1007-869X 1007-869x |
Relation: | https://doaj.org/toc/1007-869X |
DOI: | 10.16037/j.1007-869x.2024.08.038.html |
DOI: | 10.16037/j.1007-869x.2024.08.038 |
URL الوصول: | https://doaj.org/article/7313a0f0381540338a38c78d47f678c8 |
رقم الانضمام: | edsdoj.7313a0f0381540338a38c78d47f678c8 |
قاعدة البيانات: | Directory of Open Access Journals |
تدمد: | 1007869X 1007869x |
---|---|
DOI: | 10.16037/j.1007-869x.2024.08.038.html |