Deformation Control for Foundation Pit Segmented Construction Adjacent to Operational High-speed Railway Lines

التفاصيل البيبلوغرافية
العنوان: Deformation Control for Foundation Pit Segmented Construction Adjacent to Operational High-speed Railway Lines
المؤلفون: LI Xiaolong, LIAO Weilian, XIAO Fei, CHEN He, DI Honggui, HE Shuqi
المصدر: Chengshi guidao jiaotong yanjiu, Vol 27, Iss 8, Pp 223-226 (2024)
بيانات النشر: Urban Mass Transit Magazine Press, 2024.
سنة النشر: 2024
المجموعة: LCC:Transportation engineering
مصطلحات موضوعية: foundation pit, segmented construction, deformation control, operational high-speed railway line, Transportation engineering, TA1001-1280
الوصف: Objective Limited land use resource and arrangement adjacent to operational high-speed railway lines pose significant challenges to some city foundation pit constructions and the railway operational safety. To reasonably predict and control the foundation pit and adjacent high-speed railway subgrade deformations, it is necessary to conduct deformation control studies on foundation pit construction. Method Based on an open-cut foundation pit near a high-speed railway subgrade in Shanghai, Plaxis 3D software is used to analyze the impact of different foundation pit segmented construction lengths on the enclosure structure and adjacent high-speed railway subgrade, and the deformation control effectiveness of segmented construction on foundation pit itself and adjacent high-speed railway subgrade is analyzed according to field-measured data. Result & Conclusion Segmented construction can effectively reduce the deformation of both the foundation pit enclosure structure and the existing high-speed railway subgrade. The shorter the segmented length is, the smaller the deformation of foundation pit and existing high-speed railway subgrade, and the more evident inhibition corner effect formed by foundation pit segmentation walls has on enclosure structure deformation. Based on field measurement data, with a segmented length of 30 m, both of the foundation pit enclosure structure deformation and the high-speed railway subgrade vertical deformation remain in standard limits; however, the subgrade horizontal deformation exceeds the limit requirements.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: Chinese
تدمد: 1007-869X
1007-869x
Relation: https://doaj.org/toc/1007-869X
DOI: 10.16037/j.1007-869x.2024.08.038.html
DOI: 10.16037/j.1007-869x.2024.08.038
URL الوصول: https://doaj.org/article/7313a0f0381540338a38c78d47f678c8
رقم الانضمام: edsdoj.7313a0f0381540338a38c78d47f678c8
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:1007869X
1007869x
DOI:10.16037/j.1007-869x.2024.08.038.html