Arnaudon, L, Baudrenghien, P, Bertone, C, Body, Y, Broere, J, Brunner, O, Buzio, M, Carli, C, Caspers, F, Corso, JP, Coupard, J, Dallocchio, A, Dos Santos, N, Garoby, R, Gerigk, F, Hammouti, L, Hanke, K, Jones, M, Kozsar, I, Lettry, J, Lallement, JB, Lombardi, A, Lopez-Hernandez, LA, Maglioni, C, Mathot, S, Maury, S, Mikulec, B, Nisbet, D, Noels, C, Paoluzzi, M, Puccio, B, Raich, U, Ramberger, S, Rossi, C, Schwerg, N, Scrivens, R, Vandoni, G, Weisz, S, Vollaire, J, Vretenar, M, Zickler, T |
سنة النشر: |
2011 |
المجموعة: |
CERN Document Server (CDS) |
مصطلحات موضوعية: |
Accelerators and Storage Rings |
الوصف: |
As the first step of a long-term programme aiming at an increase in the LHC luminosity, CERN is building a new 160 MeV H¯ linear accelerator, Linac4, to replace the ageing 50 MeV Linac2 as injector to the PS Booster (PSB). Linac4 is an 86-m long normal-conducting linac made of an H¯ source, a Radio Frequency Quadrupole (RFQ), a chopping line and a sequence of three accelerating structures: a Drift-Tube Linac (DTL), a Cell-Coupled DTL (CCDTL) and a Pi-Mode Structure (PIMS). The civil engineering has been recently completed, and construction of the main accelerator components has started with the support of a network of international collaborations. The low-energy section up to 3 MeV including a 3-m long 352 MHz RFQ entirely built at CERN is in the final construction phase and is being installed on a dedicated test stand. The present schedule foresees beam commissioning of the accelerator in the new tunnel in 2013/14; the moment of connection of the new linac to the CERN accelerator chain will depend on the LHC schedule for long shut-downs. |
نوع الوثيقة: |
other/unknown material |
اللغة: |
English |
Relation: |
http://cds.cern.ch/record/1378473; CERN-ATS-2011-041; oai:cds.cern.ch:1378473 |
الاتاحة: |
http://cds.cern.ch/record/1378473 |
رقم الانضمام: |
edsbas.F4075093 |
قاعدة البيانات: |
BASE |