Academic Journal

Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach

التفاصيل البيبلوغرافية
العنوان: Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach
المؤلفون: Chen, SK (Chen, Shang-Kuan), Ti, YW (Ti, Yen-Wu), Tsai, KY (Tsai, Kuo-Yu)
المساهمون: 應數系
سنة النشر: 2016
المجموعة: Chinese Culture University: Institutional Repository (CCUR)
مصطلحات موضوعية: VARIABLE NEIGHBORHOOD SEARCH, PROJECTS, ALGORITHM, MODEL
الوصف: In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines.
نوع الوثيقة: article in journal/newspaper
وصف الملف: 102 bytes; text/html
اللغة: Chinese
Relation: SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS 文獻號碼: 2150692; http://ir.lib.pccu.edu.tw//handle/987654321/35964; http://ir.lib.pccu.edu.tw/bitstream/987654321/35964/2/index.html
الاتاحة: http://ir.lib.pccu.edu.tw//handle/987654321/35964
http://ir.lib.pccu.edu.tw/bitstream/987654321/35964/2/index.html
رقم الانضمام: edsbas.910E7BEC
قاعدة البيانات: BASE