Academic Journal
Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach
العنوان: | Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach |
---|---|
المؤلفون: | Chen, SK (Chen, Shang-Kuan), Ti, YW (Ti, Yen-Wu), Tsai, KY (Tsai, Kuo-Yu) |
المساهمون: | 應數系 |
سنة النشر: | 2016 |
المجموعة: | Chinese Culture University: Institutional Repository (CCUR) |
مصطلحات موضوعية: | VARIABLE NEIGHBORHOOD SEARCH, PROJECTS, ALGORITHM, MODEL |
الوصف: | In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines. |
نوع الوثيقة: | article in journal/newspaper |
وصف الملف: | 102 bytes; text/html |
اللغة: | Chinese |
Relation: | SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS 文獻號碼: 2150692; http://ir.lib.pccu.edu.tw//handle/987654321/35964; http://ir.lib.pccu.edu.tw/bitstream/987654321/35964/2/index.html |
الاتاحة: | http://ir.lib.pccu.edu.tw//handle/987654321/35964 http://ir.lib.pccu.edu.tw/bitstream/987654321/35964/2/index.html |
رقم الانضمام: | edsbas.910E7BEC |
قاعدة البيانات: | BASE |
الوصف غير متاح. |