Ground Settlement Law, Jacking Force Prediction, and Control Countermeasures for Large-Section Rectangular Pipe Jacking of National Highway Underpass

التفاصيل البيبلوغرافية
العنوان: Ground Settlement Law, Jacking Force Prediction, and Control Countermeasures for Large-Section Rectangular Pipe Jacking of National Highway Underpass
المؤلفون: Deyu Qian, Hexi Jiao, Zexiang Li, Yingli Zhu, Jiale Liu, Zhenglong Chen, Xing Gao, Hongwang Liu, Baihong Tao, Zixiang Xu
المصدر: Sustainability; Volume 15; Issue 17; Pages: 12888
بيانات النشر: Multidisciplinary Digital Publishing Institute
سنة النشر: 2023
المجموعة: MDPI Open Access Publishing
مصطلحات موضوعية: subway entrance, rectangular pipe jacking, jacking force, slurry sleeve, grouting pressure, earth chamber pressure, ground settlement, control countermeasures
جغرافية الموضوع: agris
الوصف: The rectangular pipe jacking method is an efficient, green, trenchless technology for constructing urban underground space. However, some problems, including the high jacking resistance, the instability of the tunneling face, and excessive ground settlement during the large-section rectangular pipe jacking for the underpass of national highways, seriously affect construction safety and traffic. Based on the engineering background of the large-section rectangular pipe jacking in constructing the subway entrance tunnel of Guangzhou Metro Line 7, this work adopts the methods of theoretical calculation, numerical simulation, and engineering application. Five kinds of mechanical models for pipe soil slurry interactions in rectangular pipe jacking are analyzed. An evaluation of the applicability of the jacking force prediction of the different models is conducted. Moreover, the ground settlement law for the large-section rectangular pipe jacking for the underpass of national highways under different influencing factors, including slurry sleeve thickness, grouting pressure, and earth chamber pressure, is revealed. The control countermeasures of the ground settlements, such as installing a waterproof rubber curtain for the tunnel portal, pipe jacking machine receiving techniques, thixotropic slurry for reducing friction resistance, and soil stability at the tunneling face, are carried out. The results show that there is no need to install an intermediate jacking station in the large-section rectangular pipe jacking project with a jacking distance of 63 m. The most reasonable thickness of the thixotropic slurry sleeve is about 150 mm. The most reasonable grouting pressure range is 600–700 kPa. An earth chamber pressure of about 153 kPa is more reasonable to control the soil stability of the tunneling face. The engineering practice shows that the maximum ground settlement of the national highway during jacking is 10 mm. The maintenance effect is excellent, and the traffic operates normally.
نوع الوثيقة: text
وصف الملف: application/pdf
اللغة: English
Relation: Sustainable Engineering and Science; https://dx.doi.org/10.3390/su151712888
DOI: 10.3390/su151712888
الاتاحة: https://doi.org/10.3390/su151712888