Academic Journal

RATING ASSESSMENT OF THE PRIORITY OF CONSTRUCTION AT THE AUTOMATED PACKING EQUIPMENT BASIS

التفاصيل البيبلوغرافية
العنوان: RATING ASSESSMENT OF THE PRIORITY OF CONSTRUCTION AT THE AUTOMATED PACKING EQUIPMENT BASIS
المؤلفون: O. Serkiz, M. Boyko, N. Sokil
المصدر: Technological Complexes, 1(15), 72-77, (2018-12-12)
بيانات النشر: Zenodo
سنة النشر: 2018
المجموعة: Zenodo
مصطلحات موضوعية: Packing equipment, technological schemes, classification marks, devices used, weighting criteria (factors) of evaluation, matrix of priorities, decision matrix
الوصف: A generalized model of automated packing equipment was developed. The functional classification of equipment for the used technological units and devices is carried out. The analysis of the means for carrying out the rating estimation for determining the priority of the construction from the alternatively developed variants is carried out
نوع الوثيقة: article in journal/newspaper
اللغة: English
Relation: https://doi.org/10.5281/zenodo.2669572; https://doi.org/10.5281/zenodo.2669573; oai:zenodo.org:2669573
DOI: 10.5281/zenodo.2669573
الاتاحة: https://doi.org/10.5281/zenodo.2669573
Rights: info:eu-repo/semantics/openAccess ; Creative Commons Attribution 4.0 International ; https://creativecommons.org/licenses/by/4.0/legalcode
رقم الانضمام: edsbas.13B94D9D
قاعدة البيانات: BASE