Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic

التفاصيل البيبلوغرافية
العنوان: Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
المؤلفون: Xiao Jiang, Tao Junbo, Zhen-Hua He, Xin Kang, Chen Lingkun, Shu Quan, Xing-Jun Ji, Lizhong Jiang, Yuan Ruipeng, Xin Li, Lu Xingyu
المصدر: Automation in Construction
بيانات النشر: Elsevier BV, 2021.
سنة النشر: 2021
مصطلحات موضوعية: Engineering, Rapid construction, Big data, 0211 other engineering and technologies, 020101 civil engineering, 02 engineering and technology, Article, Construction engineering, 0201 civil engineering, Building information model (BIM) technology, 021105 building & construction, Light steel structure, Digitization, Civil and Structural Engineering, Unmanned aerial vehicles (UAVs), Modular composite building, business.industry, Workload, Building and Construction, Modular design, Drone, Wuhan Leishenshan hospital, Building information modeling, Work (electrical), Control and Systems Engineering, Accelerated design and construction, Off-site building modular units, business
الوصف: Wuhan Leishenshan/Leishenshan (“Leishenshan” for short) hospital is a makeshift emergency hospital for treating patients diagnosed with the novel coronavirus-infected pneumonia (NCIP). Engineering construction uses modular composite building finished products to the greatest extent, which reduces the workload of field operations and saves a lot of time. The building information model (BIM) technology assists in design and construction work to meet rapid construction requirements. Besides, based on the unmanned aerial vehicles (UAVs) data analysis and application platform, digitization and intelligence in engineering construction are improved. Simultaneously, on-site construction and overall hoisting were carried out to achieve maximum efficiency. This article aims to take the construction of Leishenshan Hospital as an example to illustrate how to adopt BIM technology and other high-tech technology such as big data, artificial intelligence, drones, and 5G for the fast construction of the fabricated steel structure systems in emergency engineering projects.
تدمد: 0926-5805
DOI: 10.1016/j.autcon.2021.103555
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::f90af7fdc9d37ccca31fb747b4dd0fec
https://doi.org/10.1016/j.autcon.2021.103555
Rights: OPEN
رقم الانضمام: edsair.doi.dedup.....f90af7fdc9d37ccca31fb747b4dd0fec
قاعدة البيانات: OpenAIRE
الوصف
تدمد:09265805
DOI:10.1016/j.autcon.2021.103555