New Accelerated Prefab Bridge Scheme – the NRW Bridge Modules

التفاصيل البيبلوغرافية
العنوان: New Accelerated Prefab Bridge Scheme – the NRW Bridge Modules
المؤلفون: Markus Gabler, Katrin Baumann, Abdalla Fakhouri
المصدر: IABSE Symposium, Nantes 2018: Tomorrow’s Megastructures.
بيانات النشر: International Association for Bridge and Structural Engineering (IABSE), 2018.
سنة النشر: 2018
مصطلحات موضوعية: Scheme (programming language), Engineering, business.industry, Structural engineering, business, Bridge (interpersonal), computer, computer.programming_language
الوصف: Arup had been commissioned with the design of a new modular bridge system by Straßen.NRW, the road authority of Germany’s biggest state North Rhine-Westphalia. This article describes the background of this pilot project, the design concept, as well as the structural design and construction sequence of two new bridges, which can be erected within 8-10 weeks. The design is characterized by a high degree of prefabrication, modularity as well as the use of high performance concrete to ensure an excellent durability. The bridges are designed as integral frames – spanning about up to 30 m. The use of in-situ concrete had been kept to a minimum. The structures contain no bearings, no expansion joints and no separate parapets, which significantly reduces lifecycle costs. The use of high performance concrete made an additional waterproofing layer obsolete, which also saves construction time. The bridges are designed for replacement of deficient structures. To minimize demolition time, the foundations were designed so the existing foundations could remain in place.
تدمد: 2221-3783
DOI: 10.2749/nantes.2018.s17-33
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::dfcd4795685b942d228e1ef1e29dca7f
https://doi.org/10.2749/nantes.2018.s17-33
رقم الانضمام: edsair.doi...........dfcd4795685b942d228e1ef1e29dca7f
قاعدة البيانات: OpenAIRE
الوصف
تدمد:22213783
DOI:10.2749/nantes.2018.s17-33