E-ELT assembly, integration, and technical commissioning plans

التفاصيل البيبلوغرافية
العنوان: E-ELT assembly, integration, and technical commissioning plans
المؤلفون: Stephane Guisard, Peter M. Gray, Andrew A. Wright, Christophe Dupuy, F. Gago, R. Ridings, E. Ciattaglia, J. Marrero
المصدر: SPIE Proceedings.
بيانات النشر: SPIE, 2016.
سنة النشر: 2016
مصطلحات موضوعية: Scientific instrument, Project commissioning, Computer science, 02 engineering and technology, Troubleshooting, 021001 nanoscience & nanotechnology, 01 natural sciences, Project manager, law.invention, 010309 optics, Telescope, Observatory, law, 0103 physical sciences, Systems engineering, Extremely Large Telescope, 0210 nano-technology, Simulation
الوصف: EELT AIV is the activity of assembly, integration and verification of EELT (European Extremely Large Telescope) subsystems to deliver a telescope capable of fulfilling its top-level requirements and ready to start science commissioning, leading to operations. The AIV (Assembly Integration Verification) phase covers all technical activities on Armazones and nearby Paranal Observatory from the moment the sub-systems and components are delivered or accepted on-site (from the responsible sub-system project manager). AIV includes final system tests of the completed telescope (known as “Technical Commissioning”) and the installation, alignment and telescope integration of the science instruments. The AIV phase ends with the handover of the completed telescope with installed instruments, to the start of Science Commissioning. Responsibility then passes to the Commissioning team, however the technical resources for debugging and tuning the telescope and instrument will come from a combination of the AIV team working together with the Paranal operations staff. AIV is one of the major technical challenge of E-ELT. The sheer scale and complexity of the telescope involves challenging logistics and scheduling i.e. 798 mirror segments with a staged delivery over four years, including 9,048 edge sensor and 2,394 position actuators. More than ten major sub-systems e.g. M2-3-4-5, PreFocal Station (PFS) and instruments will be integrated and tested in parallel. Finally, the technical commissioning phase will be a significant challenge. E-ELT is a highly complex active telescope system with a fully-integrated adaptive optics (AO) system. During early testing nothing will be straightforward and there will be many system-level problems to overcome. It will take a dedicated team of the “best of the best” people to troubleshoot, debug, tune, and hand over as an operational facility.
تدمد: 0277-786X
DOI: 10.1117/12.2230965
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::9a0e123021810f8d1d48ab7c7919764b
https://doi.org/10.1117/12.2230965
رقم الانضمام: edsair.doi...........9a0e123021810f8d1d48ab7c7919764b
قاعدة البيانات: OpenAIRE
الوصف
تدمد:0277786X
DOI:10.1117/12.2230965