A model used in creating a work-rest schedule for laborers

التفاصيل البيبلوغرافية
العنوان: A model used in creating a work-rest schedule for laborers
المؤلفون: Tao-Ming Cheng, Hsieh-Ching Chen, Machine Hsie, Wen-ta Hsiao
المصدر: Automation in Construction. 18:762-769
بيانات النشر: Elsevier BV, 2009.
سنة النشر: 2009
مصطلحات موضوعية: Engineering, Schedule, Operations research, business.industry, Computer programming, Energetic cost, Building and Construction, Multi-objective optimization, Scheduling (computing), Multiobjective optimization problem, Control and Systems Engineering, Genetic algorithm, business, MATLAB, computer, Civil and Structural Engineering, computer.programming_language
الوصف: This paper presents a theoretical model that can be used to create work-rest schedules for construction workers. Two objectives are proposed in the optimization processes when such schedules are created. These objectives include minimizing the time for completing jobs and minimizing any extra energy expended by laborers due to inappropriate work assignments that force them to work longer than the maximum acceptable work duration. A GA-based mechanism was developed to search the Pareto front, which is one of the effective ways for solving multiobjective optimization problems. Such a mechanism was implemented by computer programming using a numerical software tool called MATLAB. Theoretical examples demonstrated that the proposed model efficiently created work-rest schedules.
تدمد: 0926-5805
DOI: 10.1016/j.autcon.2009.02.010
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::9428a73ceb0740ffc609e7ac6ed3c476
https://doi.org/10.1016/j.autcon.2009.02.010
Rights: CLOSED
رقم الانضمام: edsair.doi...........9428a73ceb0740ffc609e7ac6ed3c476
قاعدة البيانات: OpenAIRE
الوصف
تدمد:09265805
DOI:10.1016/j.autcon.2009.02.010