ITER lower port systems integration

التفاصيل البيبلوغرافية
العنوان: ITER lower port systems integration
المؤلفون: Y. Utin, F. Lachevre, B. Boussier, C. Gliss, Thomas Jeannoutot, S. Bryan, M. Dremel, B. Levesy, J. Palmer, Michael Loughlin, Roger Reichle, Dennis Baker, J.J. Cordier, Bharat Doshi, E. Daly, R. Le Barbier, G. Dell’Orco, A. Martin, S. Maruyama, J.P. Martins, J.P. Friconneau
المصدر: Fusion Engineering and Design. 86:1812-1815
بيانات النشر: Elsevier BV, 2011.
سنة النشر: 2011
مصطلحات موضوعية: Cryostat, Vertical stabilization, business.industry, Mechanical Engineering, Divertor, Mechanical engineering, Cryopump, Port (computer networking), Main vessel, Nuclear Energy and Engineering, Electromagnetic coil, System integration, Environmental science, General Materials Science, business, Civil and Structural Engineering
الوصف: The lower port systems are installed inside the vacuum vessel lower ports and in the adjacent port cells. The vacuum vessel ports and penetrations are allocated as follow: - 4 ports dedicated to remote handling of the divertor cassettes, contain diagnostics racks and divertor cooling pipes. - 5 ports connecting the main vessel to the torus cryopumps, contain divertor cooling pipes, pellet and gas injection pipes and vertical stabilization coil feeders. - 3 penetrations connecting torus cryopumps are connected to the vacuum vessel by branch pipes. - Specific penetrations for divertor cooling lines, in-vessel viewing and glow discharge systems. The general layout of the port systems has been revised recently to improve the cryopump (8 t weight, 1.8 m diameter and 2.5 m long) maintenance scheme with remote handling tools and integrate the in-vessel vertical stabilization coil feeders. The port allocation, the pumping ports design, and interfaces in-between ports and cryostat and in-between cryopumps and cryostat have been up-dated. The integration inside the 18 port cells (11 m × 4 m each) has been reviewed to avoid clashes in between systems and to fix the openings in the port cell concrete walls. The new layout integrates safety and neutron-shielding requirements as well as remote handling and maintenance compatibility for the different systems. The paper presents the up-dated integration of the lower port systems inside the ports and the port cells. Interfaces of the port systems with the vacuum vessel, the cryostat and the port cells are described.
تدمد: 0920-3796
DOI: 10.1016/j.fusengdes.2011.03.031
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::6aea88d2ba981c759c4746295ee143c5
https://doi.org/10.1016/j.fusengdes.2011.03.031
Rights: CLOSED
رقم الانضمام: edsair.doi...........6aea88d2ba981c759c4746295ee143c5
قاعدة البيانات: OpenAIRE
الوصف
تدمد:09203796
DOI:10.1016/j.fusengdes.2011.03.031