Significant Factors of Construction Delays Among Contractors in Klang Valley and its Mitigation
العنوان: | Significant Factors of Construction Delays Among Contractors in Klang Valley and its Mitigation |
---|---|
المؤلفون: | Nor Haslinda Abas, Mohd Hanif Ismail, Ilias Said, Sasitharan Nagapan, Ahmad Farhan Roslan, Rafikullah Deraman, Faisal Sheikh Khalid, Muhammad Fikri Hasmori |
المصدر: | International Journal of Integrated Engineering. 10 |
بيانات النشر: | Penerbit UTHM, 2018. |
سنة النشر: | 2018 |
مصطلحات موضوعية: | Finance, Descriptive statistics, Process (engineering), business.industry, Mechanical Engineering, Materials Science (miscellaneous), 05 social sciences, Mean value, 0211 other engineering and technologies, 02 engineering and technology, Industrial and Manufacturing Engineering, Gross domestic product, Ranking, Construction industry, Mechanics of Materials, Order (exchange), 021105 building & construction, 0502 economics and business, Electrical and Electronic Engineering, business, 050203 business & management, Civil and Structural Engineering |
الوصف: | Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common problems that happened to most construction projects. By considering all viewpoint from various parties that involves in construction process such as contractors, client, consultant and others, this research identified the major factor that contributes to delays in Klang Valley, Malaysia. Questionnaires were distributed among respondents that involved in construction project in Klang Valley. The process of data analysis was conducted by using descriptive statistic that ranked the mean value of factors that contributes to delays. By using the ranking method, financial difficulties were recognized as the most significant factor that caused delays. Thus, by using the same method, some mitigation action has been proposed in order to avoid time overrun in construction |
تدمد: | 2600-7916 2229-838X |
DOI: | 10.30880/ijie.2018.10.02.007 |
URL الوصول: | https://explore.openaire.eu/search/publication?articleId=doi_________::373d43732ec3538d2ef2392201df91bd https://doi.org/10.30880/ijie.2018.10.02.007 |
Rights: | OPEN |
رقم الانضمام: | edsair.doi...........373d43732ec3538d2ef2392201df91bd |
قاعدة البيانات: | OpenAIRE |
تدمد: | 26007916 2229838X |
---|---|
DOI: | 10.30880/ijie.2018.10.02.007 |