Significant Factors of Construction Delays Among Contractors in Klang Valley and its Mitigation

التفاصيل البيبلوغرافية
العنوان: Significant Factors of Construction Delays Among Contractors in Klang Valley and its Mitigation
المؤلفون: Nor Haslinda Abas, Mohd Hanif Ismail, Ilias Said, Sasitharan Nagapan, Ahmad Farhan Roslan, Rafikullah Deraman, Faisal Sheikh Khalid, Muhammad Fikri Hasmori
المصدر: International Journal of Integrated Engineering. 10
بيانات النشر: Penerbit UTHM, 2018.
سنة النشر: 2018
مصطلحات موضوعية: Finance, Descriptive statistics, Process (engineering), business.industry, Mechanical Engineering, Materials Science (miscellaneous), 05 social sciences, Mean value, 0211 other engineering and technologies, 02 engineering and technology, Industrial and Manufacturing Engineering, Gross domestic product, Ranking, Construction industry, Mechanics of Materials, Order (exchange), 021105 building & construction, 0502 economics and business, Electrical and Electronic Engineering, business, 050203 business & management, Civil and Structural Engineering
الوصف: Construction industry has become one of the greatest income provider as it has contributed to the Gross Domestic Product (GDP) for Malaysia. However, construction sector has been much affected by unexpected situation such as construction delays. Delays in construction industry is one of the common problems that happened to most construction projects. By considering all viewpoint from various parties that involves in construction process such as contractors, client, consultant and others, this research identified the major factor that contributes to delays in Klang Valley, Malaysia. Questionnaires were distributed among respondents that involved in construction project in Klang Valley. The process of data analysis was conducted by using descriptive statistic that ranked the mean value of factors that contributes to delays. By using the ranking method, financial difficulties were recognized as the most significant factor that caused delays. Thus, by using the same method, some mitigation action has been proposed in order to avoid time overrun in construction
تدمد: 2600-7916
2229-838X
DOI: 10.30880/ijie.2018.10.02.007
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::373d43732ec3538d2ef2392201df91bd
https://doi.org/10.30880/ijie.2018.10.02.007
Rights: OPEN
رقم الانضمام: edsair.doi...........373d43732ec3538d2ef2392201df91bd
قاعدة البيانات: OpenAIRE
الوصف
تدمد:26007916
2229838X
DOI:10.30880/ijie.2018.10.02.007