التفاصيل البيبلوغرافية
العنوان: |
COMMISSIONING OF THE CRYOGENICS OF THE LHC LONG STRAIGHT SECTIONS. |
المؤلفون: |
Perin, A., Casas-Cubillos, J., Claudet, S., Darve, C., Ferlin, G., Millet, F., Parente, C., Rabehl, R., Soubiran, M., van Weelderen, R., Wagner, U. |
المصدر: |
AIP Conference Proceedings; 4/9/2010, Vol. 1218 Issue 1, p1309-1316, 8p |
مصطلحات موضوعية: |
SUPERCONDUCTORS, LOW temperature engineering, MAGNETICS, MAGNETISM, SOLENOIDS |
مستخلص: |
The LHC is made of eight circular arcs interspaced with eight Long Straight Sections (LSS). Most powering interfaces to the LHC are located in these sections where the particle beams are focused and shaped for collision, cleaning and acceleration. The LSSs are constituted of several unique cryogenic devices and systems like electrical feed-boxes, standalone superconducting magnets, superconducting links, RF cavities and final focusing superconducting magnets. This paper presents the cryogenic commissioning and the main results obtained during the first operation of the LHC Long Straight Sections. [ABSTRACT FROM AUTHOR] |
|
Copyright of AIP Conference Proceedings is the property of American Institute of Physics and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) |
قاعدة البيانات: |
Complementary Index |