D4.3: Digital Twin supported lean project planning, control and risk management

التفاصيل البيبلوغرافية
العنوان: D4.3: Digital Twin supported lean project planning, control and risk management
المؤلفون: Johansson, Felicia, Göransson, Ellen, Nathorst-Westfelt, Philip, Jongeling, Rogier, Claeson-Jonsson, Christina, Tomar, Rahul, Gonçalves, João, Chacón Flores, Rolando Antonio, Jungmann, Manuel, Renter, Jorg
المساهمون: Universitat Politècnica de Catalunya. Departament d'Enginyeria Civil i Ambiental, Universitat Politècnica de Catalunya. ATEM - Anàlisi i Tecnologia d'Estructures i Materials
سنة النشر: 2022
المجموعة: Universitat Politècnica de Catalunya, BarcelonaTech: UPCommons - Global access to UPC knowledge
مصطلحات موضوعية: Àrees temàtiques de la UPC::Enginyeria civil, Civil engineering--Environmental aspects, Enginyeria civil -- Aspectes ambientals
الوصف: There is a considerable opportunity to improve the planning and control of construction work. The construction industry is still struggling to adopt to the digital revolution’s concepts due to complexity, uncertainty, the fragmented supply chain, the short-term thinking, and the culture of ad hoc solutions. The main purpose of this document is to describe the business and decision-making processes to support lean project planning, control, and risk management with digital twin data. ; There is a considerable opportunity to improve the planning and control of construction work. The construction industry is still struggling to adopt to the digital revolution’s concepts due to complexity, uncertainty, the fragmented supply chain, the short-term thinking, and the culture of ad hoc solutions. The main purpose of this document is to describe the business and decision-making processes to support lean project planning, control, and risk management with digital twin data. Additionally, this document also presents and describes a process model that has been developed for the construction phase. In this task, three demo-sites have been investigated. All three projects were building construction projects hence no infrastructure projects have been researched. To describe the designed process model, IDEF0-notation was used. A vital part of using digital twins to support process management and agile planning is the capture of data from the site. The produced process model contains five different process groups: initiating, planning, implementing, controlling, and closing and is generally based on the demonstration sites within the ASHVIN project and applicable to constructions sites worldwide. From each demonstration site information was gathered considering how data-collection had been conducted on each site using various digital tools and how they corresponded to the different KPI’s within the project. The methods were then analysed and evaluated how they could be implemented in a work breakdown structure (WBS) and location ...
نوع الوثيقة: report
وصف الملف: 52 p.; application/pdf
اللغة: English
Relation: info:eu-repo/grantAgreement/EC/H2020/958161/EU/Assistants for Healthy, Safe, and Productive Virtual Construction Design, Operation & Maintenance using a Digitial Twin/Ashvin; Johansson, F. [et al.]. D4.3: Digital Twin supported lean project planning, control and risk management. 2022. DOI 10.5281/zenodo.7313175.; https://zenodo.org/record/7313175#.Y48fuXaZNPY; http://hdl.handle.net/2117/377698
DOI: 10.5281/zenodo.7313175
الاتاحة: http://hdl.handle.net/2117/377698
https://zenodo.org/record/7313175#.Y48fuXaZNPY
https://doi.org/10.5281/zenodo.7313175
Rights: Attribution 4.0 International ; http://creativecommons.org/licenses/by/4.0/ ; Open Access
رقم الانضمام: edsbas.20B55A2E
قاعدة البيانات: BASE