-
1
المؤلفون: Flamm, Leander, Mönsters, Michael, Weik, Norman
مصطلحات موضوعية: paths, infrastructure, NGT BIT, case study, high-speed train, Germany, direct connection, train, high-speed line, signalling, technical requirements, reference line, slip coaching, capacity, microscopic simulation, travel times, journey time, interchange, high-speed rail traffic, next generation train, operation, operational concept, timetable concept, NGT, railways, timetable, virtual coupling, rail operation
-
2
المؤلفون: Mönsters, Michael, Flamm, Leander
مصطلحات موضوعية: Angebot, Takt, offer, infrastructure, NGT BIT, Trassen, case study, Bahnbetrieb, Germany, train paths, high-speed line, Virtual Coupling, Reisezeit, Bahn, timetable paths, Fahrplan, Schnellfahrstrecke, Slip Coaching, Referenzstrecke, Virtuelle Kupplung, Fahrplankonzept, Fahrzeit, NGT, railroad operation, railroad, Betrieb, high-speed traffic, Fahrplantrassen, Fallstudie, Konzept, control and safety technology, Betriebskonzept, Direktverbindung, Machbarkeit, Hochgeschwindigkeitsverkehr, direct connection, Deutschland, Umsteigen, Leit- und Sicherungstechnik, reference line, capacity, Infrastruktur, Umstieg, Next Generation Train, interchange, Dynamisches Flügeln, operation, operational concept, timetable concept, travel time, timetable, transfer, concept, Kapazität, feasibility
-
3Dissertation/ Thesis
المؤلفون: Jakub Havelka
المساهمون: Kruntorád Jan, Cymorek Marek
مصطلحات موضوعية: regionální doprava, hromadná doprava, linkové vedení, provozní koncept, systematické přestupy, přestupní uzel, poloha zastávek, regional transport, mass transport, public transport lines, timetable concept, systematic transfers, transfer hub, placement of stops
وصف الملف: application/pdf
Relation: KOS-1201007887905; http://hdl.handle.net/10467/107415
الاتاحة: http://hdl.handle.net/10467/107415