-
1Academic Journal
المؤلفون: Fei Wang, Zenghui Di, Ningyuan Zhang, Yangjie Ruan, Bin Luo, Yiquan Wang, Xin Liu
المصدر: Buildings, Vol 14, Iss 8, p 2523 (2024)
مصطلحات موضوعية: spoke-type single-layer cable net, finite element model, construction process simulation, robotic total station (RTS), configuration monitoring, Building construction, TH1-9745
وصف الملف: electronic resource
-
2Dissertation/ Thesis
المؤلفون: Jimenez Roberto, Yabin Esteban
مصطلحات موضوعية: Bauablaufsimulation, BIM-Anwendungsfall, Building Information Modeling (BIM), Digitalisierung, Terminplanung, Construction process simulation, BIM use case, Digitization, Scheduling
جغرافية الموضوع: FCW:BG:BB, vls-obvfcwoa-1303711
وصف الملف: 273 Seiten; text/html
Relation: vignette : https://pub.fh-campuswien.ac.at/titlepage/urn/urn:nbn:at:at-fhcw:1-127110/128; local:99148549648103331; system:AC17329577
-
3Academic Journal
المؤلفون: Xinwen Ning, Qing Zhu, Heng Zhang, Changjin Wang, Zujie Han, Junxiao Zhang, Wen Zhao
المصدر: ISPRS International Journal of Geo-Information; Volume 9; Issue 5; Pages: 292
مصطلحات موضوعية: high-speed railway, construction process simulation, construction method simulation, virtual geographic environment
جغرافية الموضوع: agris
وصف الملف: application/pdf
Relation: https://dx.doi.org/10.3390/ijgi9050292
الاتاحة: https://doi.org/10.3390/ijgi9050292
-
4Academic Journal
المؤلفون: Kailun Feng, Weizhuo Lu, Thomas Olofsson, Shiwei Chen, Hui Yan, Yaowu Wang
المصدر: Sustainability; Volume 10; Issue 11; Pages: 3868
مصطلحات موضوعية: environmental impacts, construction process simulation, process-based life cycle assessment, construction operations, supply chain
جغرافية الموضوع: agris
وصف الملف: application/pdf
Relation: Sustainable Engineering and Science; https://dx.doi.org/10.3390/su10113868
الاتاحة: https://doi.org/10.3390/su10113868
-
5Academic Journal
مصطلحات موضوعية: lean construction, construction process simulation, construction labor productivity, construcción sin pérdidas, simulación de procesos constructivos, productividad de mano de obra en construcción
وصف الملف: application/pdf; application/x-rar; application/vnd.openxmlformats-officedocument.wordprocessingml.document
Relation: Inge Cuc; J. D. Céspedes Henao, "Mejoramiento de la productividad en construcción: time-lapse y simulación digital como herramientas de análisis," Universidad de los Andes, Bogotá, 2010.; L. Koskela -, Application of the New Production Philosophy to Construction. Laboratory for urban planning and building design, 1992. A. Serpell and L. F. Alarcón, Planificación y control de proyectos. Ediciones Universidad Católica de Chile, 2009.; A. Gómez, "Simulación de procesos constructivos," Revista ingeniería de construcción, 2010. http://dx.doi.org/10.4067/S0718-50732010000100006; L. F. Alarcon, S. Fuster, M. Mora, and D. Sossdorf, "Utilización de imágenes y videos digitales para el mejoramiento de la productividad y prevención de riesgos en operaciones de construcción," 2009.; A. Gómez, J. Echeverry, X. Giraldo, C. Otalora, and M. L. Cano, "Mejoramiento de procesos constructivos a partir de un módulo programable para captura de imágenes y simulación digital" Rev. Ing. Construcción, vol. 27, 2012. http://dx.doi.org/10.4067/S0718-50732012000200003; M. Radosavljević and R. M. W. Horner, "The evidence of complex variability in construction labour productivity," Constr. Manag. Econ., vol. 20, no. 1, pp. 3–12, Jan. 2002. http://dx.doi.org/10.1080/01446190110098961; A. Enshassi, S. Mohamed, and S. Abushaban, "Factors affecting the performance of construction projects in the Gaza strip," J. Civ. Eng. Manag., vol. 15, no. 3, pp. 269–280, Jan. 2009. http://dx.doi.org/10.3846/1392-3730.2009.15.269-280; L. fernando Botero and H. Acevedo, "Simulación de operaciones y línea de balance," Ingeniería y ciencia, pp. 29–45, 2011.; A. Gómez, M. Granados, and I. Pérez, "Improving construction material and equipment logistics via simulation," Ing. Y Compet., vol. 17, no. 1, pp. 95–94, 2015.; S. Abourizk, "Role of Simulation in Construction Engineering and Management," J. Constr. Eng. Manag., vol. 136, 2010. http://dx.doi.org/10.1080/09613219208727186; L. F. Botero, Construcción sin perdidas, 2nd ed. 2006.; A. Cantú, J. Moreno, M. Gallina, and G. García, "Productividad real en obras civiles. Análisis de un caso," 2009.; D. Echeverry, H. Paez, and H. Mesa, "Simulación digital de procesos de construcción de estructura en concreto: casos de estudio práctico en Bogotá," Revista ingeniería de construcción, 2008.; A. Gómez, "Revista ingeniería de construcción – Simulación de procesos constructivos," Rev. Ing. Construcción, vol. 25, 2010.; M. E. Shehata and K. M. El-Gohary, "Towards improving construction labor productivity and projects' performance," Alexandria Eng. J., vol. 50, no. 4, pp. 321– 330, Dec. 2011. http://dx.doi.org/10.1016/j.aej.2012.02.001; A. Hammad, F. Vahdatikhaki, C. Zhang, M. Mawlana, and A. Doriani, "Towards the smart construction site: Improving productivity and safety of construction projects using multi-agent systems, real-time simulation and automated machine control," 2012, pp. 1–12. http://dx.doi.org/10.1109/WSC.2012.6465160; S. AbouRizk, D. Halpin, Y. Mohamed, and U. Hermann, "Research in Modeling and Simulation for Improving Construction Engineering Operations," J. Constr. Eng. Manag., vol. 137, no. 10, pp. 843–852, Oct. 2011. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000288; F. Berner, V. Kochkine, I. Habenicht, S. Spieckermann, and C. Vath, "Simulation in manufacturing planning of buildings," 2013, pp. 3306–3317. http://dx.doi.org/10.1109/WSC.2013.6721695; A. Gómez, J. Avila, and N. Quintana, "Simulación de eventos discretos y líneas de balance, aplicadas al mejoramiento del proceso constructivo de la cimentación de un edificio," Rev. Ing. y Cienc., vol. 11, no. 21, 2015. http://dx.doi.org/10.17230/ingciencia.11.21.8; 31; 21; 12; https://revistascientificas.cuc.edu.co/ingecuc/article/download/666/pdf_11; https://revistascientificas.cuc.edu.co/ingecuc/article/download/666/1590; https://revistascientificas.cuc.edu.co/ingecuc/article/download/666/1600; Núm. 1 , Año 2016 : (Enero - Junio); https://hdl.handle.net/11323/12125; https://doi.org/10.17981/ingecuc.12.1.2016.02
-
6Academic Journal
المصدر: INGE CUC; Vol. 12 No. 1 (2016): (January - June); 21-31 ; INGE CUC; Vol. 12 Núm. 1 (2016): (Enero - Junio); 21-31 ; 2382-4700 ; 0122-6517
مصطلحات موضوعية: lean construction, construction process simulation, construction labor productivity, construcción sin pérdidas, simulación de procesos constructivos, productividad de mano de obra en construcción
وصف الملف: application/pdf; application/x-rar; application/vnd.openxmlformats-officedocument.wordprocessingml.document
-
7
المؤلفون: Heng Zhang, Wang Changjin, Junxiao Zhang, Qing Zhu, Xinwen Ning, Han Zujie, Zhao Wen
المصدر: ISPRS International Journal of Geo-Information, Vol 9, Iss 292, p 292 (2020)
ISPRS International Journal of Geo-Information
Volume 9
Issue 5مصطلحات موضوعية: Hazard (logic), Computer science, Process (engineering), virtual geographic environment, Geography, Planning and Development, 0211 other engineering and technologies, lcsh:G1-922, Terrain, ComputerApplications_COMPUTERSINOTHERSYSTEMS, high-speed railway, 02 engineering and technology, Linkage (mechanical), Bridge (nautical), law.invention, construction process simulation, law, 021105 building & construction, Earth and Planetary Sciences (miscellaneous), Computers in Earth Sciences, 021107 urban & regional planning, Industrial engineering, construction method simulation, Dynamic simulation, Identification (information), Railway engineering, lcsh:Geography (General)
وصف الملف: application/pdf
-
8
المؤلفون: Shiwei Chen, Thomas Olofsson, Weizhuo Lu, Yaowu Wang, Hui Yan, Kailun Feng
المصدر: Sustainability, Vol 10, Iss 11, p 3868 (2018)
Sustainability
Volume 10
Issue 11مصطلحات موضوعية: Construction management, Process (engineering), 020209 energy, Supply chain, Geography, Planning and Development, 0211 other engineering and technologies, TJ807-830, 02 engineering and technology, Management, Monitoring, Policy and Law, TD194-195, Renewable energy sources, construction process simulation, 021105 building & construction, 0202 electrical engineering, electronic engineering, information engineering, Environmental impact assessment, process-based life cycle assessment, GE1-350, Discrete event simulation, Life-cycle assessment, supply chain, construction operations, Environmental effects of industries and plants, Renewable Energy, Sustainability and the Environment, Global warming, environmental impacts, Environmental economics, Environmentally friendly, Environmental sciences, Environmental science
وصف الملف: application/pdf
-
9Conference
المؤلفون: Lozano Galant, José Antonio, Xu, Dong, Turmo Coderque, José
المساهمون: Universitat Politècnica de Catalunya. Departament d'Enginyeria Civil i Ambiental, Universitat Politècnica de Catalunya. EC - Enginyeria de la Construcció
مصطلحات موضوعية: Àrees temàtiques de la UPC::Enginyeria civil::Materials i estructures::Tipologies estructurals, Cable-stayed bridges--Design and construction, cable-stayed bridges, construction process simulation, time-dependent phenomena, Ponts atirantats -- Disseny i construcció
وصف الملف: 8 p.
Relation: Lozano-Galant, J.A., Xu, D., Turmo, J. Simulation of the time-dependent phenomena effects in staggered erected cable-stayed bridges. A: IABSE Conference. "Structural Engineering: Providing Solutions to Global Challenges". 2015, p. 1-8.; http://hdl.handle.net/2117/83927
الاتاحة: http://hdl.handle.net/2117/83927
-
10
المؤلفون: Wisoot Jiradamkerng
المصدر: Engineering Journal, Vol 20, Iss 3 (2016)
مصطلحات موضوعية: road construction, Engineering, resources management, productivity, Process (engineering), business.industry, stroboscope, General Engineering, Standard time, Civil engineering, Subbase (pavement), Transport engineering, EZStrobe, Work (electrical), construction process simulation, lcsh:TA1-2040, Production (economics), Duration (project management), business, Unit cost, lcsh:Engineering (General). Civil engineering (General), Productivity
-
11Academic Journal
المؤلفون: Jiradamkerng, Wisoot
المصدر: Engineering Journal; Vol. 20 No. 3 (2016): Regular Issue; 183-195 ; 0125-8281
مصطلحات موضوعية: EZStrobe, stroboscope, construction process simulation, productivity, resources management, road construction
وصف الملف: application/pdf
-
12Academic Journal
المصدر: INGE CUC, ISSN 2382-4700, Vol. 12, Nº. 1, 2016 (Ejemplar dedicado a: (Enero - Junio)), pags. 21-31
مصطلحات موضوعية: lean construction, construction process simulation, construction labor productivity, construcción sin pérdidas, simulación de procesos constructivos, productividad de mano de obra en construcción
وصف الملف: application/pdf
-
13Conference
المؤلفون: Mehrdad Arashpour, Ronald Wakefield, Nick Blismas
مصطلحات موضوعية: Building construction management and project planning, Building not elsewhere classified, Construction engineering, CYCLONE, Construction process simulation, construction models, discrete-event simulation, productivity, resources, sensitivity analysis
Relation: 10779/rmit.27382059.v1
-
14Conference
المساهمون: Nikakhtar, Amin, Wong, Kuan Yew, Zarei, MOHAMMAD HOSSEIN, Memari, Ashkan
مصطلحات موضوعية: ARENA 13, construction process simulation, simulation software, WITNESS 2004 Manufactring Edition, Artificial Intelligence, Computational Theory and Mathematic, Modeling and Simulation
Relation: info:eu-repo/semantics/altIdentifier/isbn/9780769545622; ispartofbook:Proceedings - CIMSim 2011: 3rd International Conference on Computational Intelligence, Modelling and Simulation; 2nd International Conference on Computational Intelligence, Modelling and Simulation 2011, CIMSim 2011; firstpage:200; lastpage:205; numberofpages:6; http://hdl.handle.net/11311/978585; info:eu-repo/semantics/altIdentifier/scopus/2-s2.0-83155189195
-
15
المؤلفون: Jose Turmo, Xu Dong, José Antonio Lozano Galant
المساهمون: Universitat Politècnica de Catalunya. Departament d'Enginyeria Civil i Ambiental, Universitat Politècnica de Catalunya. EC - Enginyeria de la Construcció
المصدر: UPCommons. Portal del coneixement obert de la UPC
Universitat Politècnica de Catalunya (UPC)
Scopus-Elsevier
Recercat. Dipósit de la Recerca de Catalunya
instnameمصطلحات موضوعية: Long span, Engineering, Service (systems architecture), business.industry, Process (engineering), Carry (arithmetic), Computation, Enginyeria civil::Materials i estructures::Tipologies estructurals [Àrees temàtiques de la UPC], Structural engineering, time-dependent phenomena, Ponts atirantats -- Disseny i construcció, Bridge (nautical), construction process simulation, Cable-stayed bridges--Design and construction, Cable stayed, State (computer science), business, cable-stayed bridges
وصف الملف: application/pdf
-
16Academic Journal
المؤلفون: Popov, Vladimir, Juocevičius, Virgaudas, Migilinskas, Darius, Ustinovičius, Leonas, Mikalauskas, Saulius
المصدر: Automation in construction: an international research journal, Netherlands : Elsevier B.V, 2010, Vol. 19, iss. 3, p. 357-367 ; ISSN 0926-5805
-
17
المؤلفون: Wisoot Jiradamkerng
المصدر: Engineering Journal, Vol 17, Iss 2 (2012)
مصطلحات موضوعية: Truck, Engineering, business.industry, General Engineering, Process (computing), Scheduling (production processes), Structural engineering, Term (time), EZStrobe, Work (electrical), Construction Process Simulation, lcsh:TA1-2040, Precast concrete, Slab, Unit cost, business, Multiple-Activity-Chart, lcsh:Engineering (General). Civil engineering (General), Productivity
-
18
المؤلفون: Mohammad Hossein Zarei, Ashkan Memari, Kuan Yew Wong, Amin Nikakhtar
المصدر: 2011 Third International Conference on Computational Intelligence, Modelling & Simulation.
مصطلحات موضوعية: ARENA 13, business.industry, Process (engineering), Computer science, construction process simulation, simulation software, WITNESS 2004 Manufactring Edition, Artificial Intelligence, Computational Theory and Mathematics, Modeling and Simulation, Graphical display, computer.software_genre, Witness, Simulation software, Computer graphics, Software, Construction industry, Artificial intelligence, Process simulation, Software engineering, business, computer
-
19Electronic Resource
المؤلفون: Universitat Politècnica de Catalunya. Departament d'Enginyeria Civil i Ambiental, Universitat Politècnica de Catalunya. EC - Enginyeria de la Construcció, Lozano Galant, José Antonio, Xu, Dong, Turmo Coderque, José
مصطلحات الفهرس: Àrees temàtiques de la UPC::Enginyeria civil::Materials i estructures::Tipologies estructurals, Cable-stayed bridges--Design and construction, cable-stayed bridges, construction process simulation, time-dependent phenomena, Ponts atirantats -- Disseny i construcció, Conference report