-
1Academic Journal
المؤلفون: Sou-Sen Leu, Cheng-Yu Lu, Pei-Lin Wu
المصدر: Sustainability; Volume 15; Issue 5; Pages: 4570
مصطلحات موضوعية: project cost overrun, dynamic Bayesian network, input–output hidden Markov method, particle filter, Bayesian network, sequential simulation
جغرافية الموضوع: agris
وصف الملف: application/pdf
Relation: Economic and Business Aspects of Sustainability; https://dx.doi.org/10.3390/su15054570
الاتاحة: https://doi.org/10.3390/su15054570
-
2Academic Journal
المؤلفون: Sou-Sen Leu, Yanni Liu, Pei-Lin Wu
المصدر: Buildings; Volume 13; Issue 3; Pages: 667
مصطلحات موضوعية: project cost overrun, hidden Markov chain, particle filter, Bayesian sequential simulation
وصف الملف: application/pdf
Relation: Construction Management, and Computers & Digitization; https://dx.doi.org/10.3390/buildings13030667
-
3Academic Journal
المؤلفون: Flyvbjerg, Bent, Budzier, Alexander, Lee, Jong Seok, Keil, Mark, Lunn, Daniel, Bester, Dirk W.
المصدر: Flyvbjerg , B , Budzier , A , Lee , J S , Keil , M , Lunn , D & Bester , D W 2022 , ' The Empirical Reality of IT Project Cost Overrun : Discovering A Power-Law Distribution ' , Journal of Management Information Systems , vol. 39 , no. 3 , pp. 607-639 . https://doi.org/10.1080/07421222.2022.2096544
مصطلحات موضوعية: IT project cost overrun, IT project management, power-law distribution, fat-tails, elf-organized criticality, component interdependence, technological component
وصف الملف: application/pdf
الاتاحة: https://pure.itu.dk/portal/da/publications/2edf85c0-51c1-4352-b188-5cd2bcabe7af
https://doi.org/10.1080/07421222.2022.2096544
https://pure.itu.dk/ws/files/101336774/The_Empirical_Reality_of_IT_Project_Cost_Overruns_Discovering_A_Power_Law_Distribution.pdf
https://www.tandfonline.com/doi/epdf/10.1080/07421222.2022.2096544?needAccess=true&role=button -
4Academic Journal
المؤلفون: ABDARAHIM SALEM, Eric SIMPEH, Julius Fapohunda
المصدر: Journal of Construction Project Management and Innovation, Vol 10, Iss 1 (2020)
مصطلحات موضوعية: Construction project, cost overrun, project performance, risk management socio-political risk., Building construction, TH1-9745
وصف الملف: electronic resource
-
5Academic Journal
المؤلفون: K. Alzebdeh, H.A. Bashir, S.K. Al Siyabi
المصدر: The Journal of Engineering Research, Vol 12, Iss 1, Pp 53-68 (2015)
مصطلحات موضوعية: project, cost overrun, interpretive structural modelling (ism)., Engineering (General). Civil engineering (General), TA1-2040
وصف الملف: electronic resource
-
6
المؤلفون: Salihu, A. A., Ibrahim, Y., Muhammad, S.
المصدر: LAUTECH Journal of Civil and Environmental Studies; Vol. 8 No. 1 (2022); 1-14
مصطلحات موضوعية: Construction Project, Cost Overrun, Labour Productivity, Project Manager, Time Overrun
وصف الملف: application/pdf
-
7
المؤلفون: Khalid I. Alzebdeh, Hamdi A. Bashir, S. K. Al Siyabi
المصدر: The Journal of Engineering Research, Vol 12, Iss 1, Pp 53-68 (2015)
Scopus-Elsevierمصطلحات موضوعية: Structure (mathematical logic), Engineering, Cost estimate, business.industry, Control (management), General Engineering, Poor coordination, Cost overrun, Constructability, Lead (geology), Risk analysis (engineering), lcsh:TA1-2040, project, cost overrun, interpretive structural modelling (ism), Cost engineering, Systems engineering, business, lcsh:Engineering (General). Civil engineering (General)
-
8Electronic Resource
المصدر: IDB Publications
مصطلحات الفهرس: Project Cost Overrun, Budget, Investment, Institutional Capacity, Economy, Public Investment Program, Public Investment System, Investment Project, Ministries, H43 - Project Evaluation • Social Discount Rate, H54 - Infrastructures • Other Public Investment and Capital Stock, O22 - Project Analysis, cost overrun;institutional arrangement;project appraisal;public investment management
-
9Electronic Resource
المؤلفون: Leopoldo Avellán, Vitor Goncalves Cavalcanti, Pedro M. Garberi, Luis Marcano, Abraham R. Montilla, Inter-American Development Bank
المصدر: IDB Publications