-
1Academic Journal
المؤلفون: Bhutto, Muhammad Aslam1 mabhutto@cloud.neduet.edu.pk, Nasir, Mahnoor2, Marri, Amanullah3
المصدر: International Journal of Energy, Environment & Economics. 2025, Vol. 32 Issue 1, p75-96. 22p.
مصطلحات موضوعية: *COST overruns, *WATER supply, CHANNELS (Hydraulic engineering), NODULAR iron, CONSTRUCTION materials
-
2Academic Journal
المؤلفون: Coffie, G. H.1 (AUTHOR) hcoffie@htu.edu.gh, Cudjoe, S. K. F.2 (AUTHOR)
المصدر: International Journal of Construction Management. Dec2024, Vol. 24 Issue 16, p1742-1750. 9p.
مصطلحات موضوعية: *COST overruns, *CONSTRUCTION costs, *COST estimates, MACHINE learning, CONSTRUCTION cost estimates, CONSTRUCTION projects, BUILDING failures
-
3Academic Journal
المؤلفون: Love, Peter E. D.1 (AUTHOR) p.love@curtin.edu.au
المصدر: Journal of Construction Engineering & Management. Feb2025, Vol. 151 Issue 2, p1-4. 4p.
مصطلحات موضوعية: *COST overruns, *TRANSPORTATION costs, TRANSPORT theory, CAUSATION (Philosophy), PLURALISM
-
4Academic Journal
المؤلفون: Islam, Muhammad Saiful1 (AUTHOR) saiful-cee@sust.edu, Salem, Mohamed2 (AUTHOR) msalem@au.edu.kw, Tantawy, Mohamed3 (AUTHOR) mtantawy@m-eng.helwan.edu.eg, Salah, Mohamed4 (AUTHOR) omran_salah@m-eng.helwan.edu.eg
المصدر: Journal of Construction Engineering & Management. Dec2024, Vol. 150 Issue 12, p1-13. 13p.
مصطلحات موضوعية: *COST overruns, *GROUP decision making, *RISK assessment, FUZZY integrals, RISK perception
-
5Academic Journal
المؤلفون: Alassafi, Hassan Th.1 (AUTHOR) halassafi@gmail.com, Al-Gahtani, Khalid S.1 (AUTHOR) kgahtani@ksu.edu.sa, Almohsen, Abdulmohsen S.1 (AUTHOR) asmohsen@ksu.edu.sa, Alsugair, Abdullah M.1 (AUTHOR) amsugair@ksu.edu.sa
المصدر: Facilities. 2024, Vol. 42 Issue 15/16, p30-52. 23p.
مصطلحات موضوعية: *COST overruns, *HEALTH facilities, *FACILITY management, AIR ducts, SEMI-structured interviews
-
6Academic JournalCritical risk factors for construction supply chain in China: a fuzzy synthetic evaluation analysis.
المؤلفون: Deng, Binchao1 (AUTHOR) dbchao1985@tju.edu.cn, Lv, Xindong1 (AUTHOR) xindong2021@stud.tjut.edu.cn, Du, Yaling1 (AUTHOR) tdduyaling@126.com, Li, Xiaoyu1 (AUTHOR) lixiaoyu@stud.tjut.edu.cn, Yin, Yilin1 (AUTHOR) yinyilin575@163.com
المصدر: Engineering Construction & Architectural Management (09699988). 2025, Vol. 32 Issue 1, p483-506. 24p.
مصطلحات موضوعية: *SUPPLY chain management, *COST overruns, *SUPPLY chains, *CASH flow, RESEARCH personnel, PRECISION farming
-
7Academic Journal
المؤلفون: Leu, Sou-Sen1 (AUTHOR) leuss@mail.ntust.edu.tw, Huang, Kuang-Jen1 (AUTHOR) hkj0613@ms18.hinet.net, Hung, Cathy Chang-Wei1 (AUTHOR) hungcathy@mail.ntust.edu.tw, Wu, Pei-Lin1 (AUTHOR) irene871208@gmail.com
المصدر: Engineering Construction & Architectural Management (09699988). 2024, Vol. 31 Issue 12, p4975-4987. 13p.
مصطلحات موضوعية: *COST overruns, *STEEL buildings, *BAYESIAN analysis, FAULT trees (Reliability engineering), CONSTRUCTION projects
-
8Academic Journal
المؤلفون: Molinari, Laura1 (AUTHOR), Haezendonck, Elvira1 (AUTHOR), Van Rompay, Katrien1 (AUTHOR), Mabillard, Vincent2 (AUTHOR) vincent.mabillard@ulb.be, Dooms, Michaël1 (AUTHOR)
المصدر: Public Works Management & Policy. Jan2025, Vol. 30 Issue 1, p36-57. 22p.
مصطلحات موضوعية: *COST overruns, *INFRASTRUCTURE (Economics), *BUDGET, *COST, EXPLANATION
-
9Academic Journal
المؤلفون: Love, Peter E. D.1 (AUTHOR) p.love@curtin.edu.au, Ika, Lavagnon A.2 (AUTHOR), Pinto, Jeffrey K.3 (AUTHOR)
المصدر: Production Planning & Control. Dec2024, Vol. 35 Issue 16, p2286-2303. 18p.
مصطلحات موضوعية: *MONTE Carlo method, *COST overruns, *OPPORTUNITY costs, *COST estimates, *CONSTRUCTION costs
-
10Periodical
المؤلفون: Pratima H. pratimah@cybermedia.co.in
المصدر: Dataquest. Dec2024, Vol. 40 Issue 12, p20-24. 5p.
مصطلحات موضوعية: *COST overruns, *INFORMATION technology, *SERVER farms (Computer network management), *EXECUTIVES, LEARNING curve
-
11Conference
المؤلفون: Kherde, Yogesh1 (AUTHOR) ypkherde@ycce.edu, Waghe, Uday1 (AUTHOR), Thakre, Radhika1 (AUTHOR) radhikathakre13@gmail.com, Jain, Udit2 (AUTHOR) udit17788@gmail.com
المصدر: AIP Conference Proceedings. 2024, Vol. 3188 Issue 1, p1-20. 20p.
مصطلحات موضوعية: *RAILROAD design & construction, *COST overruns, *RISK assessment, *FACTOR analysis, *MONEY market funds
-
12Academic Journal
المؤلفون: Savaş, Sezer1 (AUTHOR) savas@itu.edu.tr, Acar, Emrah1 (AUTHOR), Acar, Damla2 (AUTHOR)
المصدر: International Journal of Construction Management. Nov2024, Vol. 24 Issue 15, p1698-1707. 10p.
مصطلحات موضوعية: *COST overruns, *PROJECT management, AGILE software development, ARCHITECTURAL models, CONSTRUCTION projects
-
13Academic Journal
المؤلفون: Winata, Lufta Erwin1 (AUTHOR), Gultom, Yohanna M. L.2 (AUTHOR) Yohanna.Magdalena@ui.ac.id
المصدر: International Journal of Construction Management. Sep2024, Vol. 24 Issue 13, p1398-1406. 9p.
مصطلحات موضوعية: *COST overruns, *TOLL roads, *TRANSACTION costs, *GOVERNMENT aid, LEAST squares
-
14Academic Journal
المؤلفون: Aydinli, Serkan1 (AUTHOR) saydinli@cu.edu.tr
المصدر: Construction Management & Economics. Sep2024, Vol. 42 Issue 9, p787-801. 15p.
مصطلحات موضوعية: *COST overruns, *PRICE indexes, *CONSTRUCTION costs, *ECONOMICS of war, RUSSIAN invasion of Ukraine, 2022-
-
15Academic Journal
المؤلفون: Pragitatama, Wiharsa1 wiharsapragitatama@gmail.com
المصدر: PM World Journal. Oct/Nov2024, Vol. 13 Issue 10, p1-40. 41p.
مصطلحات موضوعية: *COST overruns, *BIDS, *COST estimates, COMPARATIVE method, CONSTRUCTION projects
-
16Academic Journal
المؤلفون: Roy, Dwaipayan1 (AUTHOR), Mishra, Anant2 (AUTHOR) anant@umn.edu, Sinha, Kingshuk K2 (AUTHOR)
المصدر: Production & Operations Management. Nov2024, Vol. 33 Issue 11, p2201-2220. 20p.
مصطلحات موضوعية: *LETTING of contracts, *COST overruns, *GOVERNMENT purchasing, *GOVERNMENT agencies, *SMALL business
-
17Academic Journal
المؤلفون: El Fassi, Soufiane1 (AUTHOR), Chen, Xin1 (AUTHOR) xin.chen@cranfield.ac.uk, Riaz, Atif1 (AUTHOR), Guenov, Marin D.1 (AUTHOR), van Heerden, Albert S.J.1 (AUTHOR), Altelarrea, Sergio Jimeno1 (AUTHOR)
المصدر: Journal of Engineering Design. Oct2024, Vol. 35 Issue 10, p1258-1291. 34p.
مصطلحات موضوعية: *COST overruns, *ENGINEERING design, AEROSPACE engineering, SYSTEM failures, ENGINEERING management
-
18Academic Journal
المؤلفون: Du, Qiang1,2,3 (AUTHOR), Li, Shasha2 (AUTHOR) 2021123060@chd.edu.cn, Zhang, Yani2 (AUTHOR), Zhang, Yerong2 (AUTHOR)
المصدر: RAIRO: Operations Research (2804-7303). Nov/Dec2024, Vol. 58 Issue 6, p4905-4925. 21p.
مصطلحات موضوعية: *COST overruns, *SUPPLY chains, SUSTAINABLE construction, CASCADE connections, COMPUTER simulation
-
19Academic Journal
المؤلفون: Abaza, Mohamed1 (AUTHOR) mabaza@txstate.edu, Kisi, Krishna2 (AUTHOR) kpkisi@txstate.edu
المصدر: Journal of Construction Engineering & Management. Nov2024, Vol. 150 Issue 11, p1-9. 9p.
مصطلحات موضوعية: *CONTRACTS, *COST overruns, *STAKEHOLDER analysis, *INDUSTRIAL engineering, RESEARCH questions
-
20Academic Journal
المؤلفون: Youssefi, Iman1 (AUTHOR) iman.youssefi@emu.edu.tr, Celik, Tolga1 (AUTHOR) tolga.celik@emu.edu.tr
المصدر: Engineering Construction & Architectural Management (09699988). 2024, Vol. 31 Issue 10, p4099-4124. 26p.